FAQ
Quick guide: Questions and answers on solar energy
If you have any questions about solar energy that aren’t answered here, please don’t hesitate to contact us. We’ve compiled a list of frequently asked questions and their answers for your convenience.
Solar Energy FAQs
Generally, no. While south-facing roofs are ideal for maximum efficiency, east- and west-facing roofs can still produce similar amounts of energy. What’s more important is minimizing shading from trees or buildings. In Cornwall, we benefit from more daylight than most parts of the UK, ensuring good energy production from various roof orientations.
Solar panels typically come with a 20-25 year warranty, but they can often last for up to 40 years, continuing to generate energy at slightly reduced efficiency.
A typical home solar system requires about 12 panels to generate 4 kilowatts of power, which is enough to cover most household needs. The number of panels you need depends on your energy consumption and available roof space.
Shade from trees, chimneys, or nearby buildings can significantly reduce the energy output of solar panels. Before installation, we assess shading issues and provide an accurate estimate of your potential energy generation.
No, photovoltaic (PV) panels do not directly heat water. However, excess electricity generated by PV panels can be diverted to an immersion heater, indirectly heating water for your home.
A typical 4-kilowatt system can be installed within a day, though larger or more complex installations may take longer.
Our solar panels are installed to withstand strong winds, particularly in coastal areas. We use wind load data and manufacturer guidelines to ensure your system is durable in high-wind conditions.
Yes, solar panels can be mounted on flat roofs using brackets that tilt the panels to the ideal angle for sun exposure, maximizing energy efficiency.
The optimal roof angle is between 38 and 40 degrees for solar panels, but panels can still function effectively with different roof angles
Yes, solar panels can be installed on ground-mounted structures or other suitable surfaces if roof space is insufficient or unavailable.
Domestic Electrical Services FAQs
It’s recommended to have your electrical system inspected every 10 years in owner-occupied homes and every 5 years in rental properties to ensure safety and compliance with regulations
Frequent tripping of circuit breakers, flickering lights, burning smells from outlets, and discolored sockets are all signs that your home may require rewiring.
While Portable Appliance Testing (P.A.T.) is not legally required in domestic homes, it’s a good safety measure for homeowners with multiple appliances, especially if the home is rented out.
It’s not recommended for safety reasons. For major electrical work, such as rewiring, installing consumer units, or new circuits, you should always hire a qualified electrician.
Upgrading to LED lighting, installing smart thermostats, and using energy-efficient appliances are great ways to reduce energy consumption and lower your electricity bills.
A consumer unit upgrade involves replacing an old fuse box with a modern system that offers better safety and circuit protection, including residual current devices (RCDs).
Most installations, such as adding new lighting or sockets, can be completed within a few hours, depending on the complexity of the job.
Yes, outdoor electrical installations require specialized waterproof fittings and protective coverings to withstand weather conditions and prevent electrical hazards.
Generally, no planning permission is required for electrical work, but it must comply with UK building regulations, especially in older or listed properties.
Choosing an NICEIC-approved electrician ensures that your electrical work meets the highest safety standards and complies with current regulations.
EV Charging Solutions FAQs
A standard home charger (7kW) typically takes 6-8 hours to fully charge an electric vehicle, making overnight charging the most convenient option.
Yes, but you’ll need permission from your landlord before proceeding with the installation of an EV charger. Some landlords may even benefit from government grants to install chargers for tenants.
Yes, EV chargers require a dedicated circuit for safe and efficient operation. Our team will ensure that your electrical system is equipped to handle the increased load.
Yes, the UK government offers the *EV chargepoint grant*, covering up to £350 towards the cost of installing a home EV charger.
Yes, with the right setup, you can use solar energy to charge your electric vehicle, reducing your reliance on grid electricity and further lowering your energy costs.
Installation costs typically range from £500 to £1,000, depending on the complexity of the installation and any additional electrical work required.
Many modern EV chargers come with smart features that can be controlled remotely via Wi-Fi, allowing you to monitor charging, schedule times, and take advantage of off-peak energy rates.
Most EV chargers can be installed within a day. We’ll conduct a site survey beforehand to ensure everything runs smoothly on installation day.
A 7kW charger is typically used for home installations and provides a full charge in 6-8 hours. A 22kW charger is faster but requires a three-phase power supply, making it more suitable for commercial properties.
Yes, you can install multiple EV chargers at your home or business, depending on your electrical system’s capacity. We can assess your property and recommend the best setup for your needs.